Determining Maximum Pipe Size
Maximum pipe size supported by any of the strut supports is determined by the load and the clear space required between the pipes. The spacing between pipes should be as follows:
- 1" between piping 3" and smaller.
- 1-1/2" between a pipe 3" and smaller and a pipe 4" or larger.
- 2" between piping 4" and larger.
- At least 1" between pipe clamp and end of strut
For example, a support for two 3" pipes would require:
1" + 3" + 1-1/2" + 3" + 1" = 9-1/2" wide channel support
Note:
Base for 2.5-CS-5, 2.5-CS-7 shown. Other bases
have additional support or flanges to handle the increased loads.
All bases are polycarbonate material