Trapeze Installation
1. Align end holes of Unistrut P1000T on bases and attach using supplied hardware. Torque screw to 19 ft./lbs.
2. Place pipe/tubing on support and attach with appropriate pipe/tubing clamp.
Part Number | Qty. Unipier Bases | Supporting Channel | |
Qty. | Description | ||
UP-MPDS-26HG | 4 | 2 | 26" - P1000T HG for Trapeze |
UP-MPDS-38HG | 4 | 2 | 38" - P1000T HG for Trapeze |
UP-MPDS-50HG | 4 | 2 | 50" - P1000T HG for Trapeze |
UP-MPDS-62HG | 4 | 2 | 62" - P1000T HG for Trapeze |
NOTE:
1. The maximum uniform load on P1000T is 400 lbs.
2. Uniform load is limited by roof base allowed load of 200 lbs. (5 psi on roof).
NOTE: Kits do not include pipe/tubing or clamps.